Professional Anti Ram Raid Telescopic Security Parking Post

Professional Anti Ram Raid Telescopic Security Parking Post

Product Information

Professional Anti Ram Raid Telescopic Security Parking Post

 

  • FOR DELIVERY TO DESTINATIONS OUTSIDE MAINLAND UK please call for additional carriage charges
  • This item shipped via 3 day courier.
  • Extra heavy duty 100mm square Anti-Ram raid security parking post.
  • Extends to 540mm high. (Lifting weight is appx 9.5Kgs).
  • Retractable handle for easy operation.
  • Anti ram raid deterrent.
  • 4mm Wall Thickness
  • Tough 4mm steel construction.
  • Zinc plated for rust protection.
  • Comes with kick plate & Padlock.

Professional Anti-Ram Raid Telescopic Security Parking Post Description

Extra heavy duty 100mm square Anti-Ram raid security parking post.

  • Submerges into the ground into its own steel sleeve to sit flush when not required.
  • Includes high security 4 pin cylinder padlock with double bolted shackle and fully enclosed hasp.

    INSTALLATION
    1. Please read “Important Notes” below
    2. Choose a location for the Security Parking Post ensuring that the post will be free from obstructions in both the raised and lowered positions.
    3. Dig the hole 5” (127mm) deeper than the length of the ground socket.
    4. The width of the hole should be at least 12” square.
    5. For water drainage line the bottom of the hole with either gravel or rubble
    6. Position the steel stabilising rod into the holes at the bottom of the Security post. Place the ground socket into the hole so that the top of the post is at ground level.
    7. Wedge the post in position and check that it is vertical, it may help to extend the post to check with a spirit level that the post is vertical. Now retract the post and fill 50% of the hole with hardcore and compact. Check that the post is still vertical and fill the hole with concrete to the surface level.
    8. Check that the post is still vertical by extending the post, then retract and leave in the down position for at least 48 hours or until the concrete is fully set.
    The Concrete Mix should be a strong mix (i.e. not too wet) we recommend a mix of 1 part concrete to 3 parts aggregate.

    “Important Notes” Please read carefully.
    When deciding the location of the post, look for drainage covers etc and avoid installation between these points to try to prevent uncovering pipes etc. Dig slowly using hand tools so that if you do encounter a pipe or cable you do not damage them. If you do encounter a pipe or cable re-fill and select a new location. If in doubt consult a qualified builder for installation of this product.
  •  
  • Price: £159.99




     

  •  

     

     

     

     

     

     

     

     

    Price: 159.99


    Product Code: CP64
     
    Quantity: Add to Basket

    About Us | Contact Us | Terms & Conditions
    Powered by CubeCart™. Installed by Installatron.
    Copyright Devellion Limited 2006. All rights reserved.